FAQs

Safety
  • The pool is wrapped with soft mats
  • The system has deep water over 30cm depth or use the flexible membrane, it will be soft falls for all ages.
  • Players are accompanied with coaches at any time
  • Top safety considerations for every part of the system.
تثبيت
  • We have one experienced team for the system installation, all of them has over 10 years’ experience on the average.
  • For overseas projects, we send supervisors to the site and the clients prepare the site according to our drawings and provide around 10 workers and machines such as cranes,welders etc.
  • The installation time is around 20-30 days, depending on the site condition
Riding capacity
  • Riding time: around 20-50 seconds depending on the riding experience.
  • Rounds: around 30-60 minutes.
  • Capacity per round: over 15 surfers per round
  • Riders: 1-3 riders at the same riding
Maintenance
  • Regular pump control room Electrical components check.
  • Good ventilation in pump room.
  • Water treatment required for water cleaning daily.
  • No operational downtime.
  • Occasional replacement of spare parts like surfboards and sidewall panels.